Relay Settings and Relay Coordination for Local Substation

Category:

System Protection

Year:

2019

SynchroGrid developed relay settings and provided relay coordination services for a local substation.

Pattern Energy: NERC PRC IESO Scope Addition

Category:

NERC Compliance

Year:

2019

SynchroGrid performed engineering calculations for a number of Pattern wind farms in Ontario.

Relay Settings for Feeder and Bus Tie Protection

Category:

System Protection

Year:

2019

SynchroGrid provided relay settings for a local substation.

CTT: T60 Relay Replacement

Category:

System Protection

Year:

2019

SynchroGrid replaced GE-T60 reactor relays with SEL-387E relays and upgraded SEL 487E-0 reactor relays with SEL-487E-3 relays.

Relay Settings Development and Coordination Study

Category:

System Protection

Year:

2019

SynchroGrid provided relay setting and relay coordination services for a local substation. 

Pattern Energy: Arc Flash Study

Category:

System Protection

Year:

2019

SynchroGrid performed an arc flash analysis for Pattern Energy.

Cross Texas Transmission: Voltage Transformer Fault Analysis

Category:

System Protection

Year:

2019

SynchroGrid provided an analysis of the operation of a 345kV bus trip. 

Relay Settings for Retrofit Transformer Panel Upgrades

Category:

System Protection

Year:

2019

SynchroGrid provided relay setting development services to upgrade two retrofit transformer panels.

Relay Settings and Coordination Services

Category:

System Protection

Year:

2018

SynchroGrid developed relay settings for transformer protection, bus protection, and feeder protection at a local substation. Relay coordination was also provided for the transformer and distribution feeder.