Category:
NERC ComplianceYear:
2020SynchroGrid performed a wide area coordination study to ensure compliance with PRC-027-1 Requirement 2.
Category:
NERC ComplianceYear:
2019SynchroGrid performed a wide area coordination for CTT’s 345kV system.
Category:
NERC ComplianceYear:
2019SynchroGrid conducted a generator NERC-PRC-025-2 compliance review for NRG.
Category:
NERC ComplianceYear:
2019SynchroGrid developed relay settings to replace reactor relays (GE-T60 and SEL-487E-0 were replaced with SEL-387E and SEL-487E-3) and updated drawings, control schematics, and GOOSE architect files to coordinate communications.
Category:
NERC ComplianceYear:
2019SynchroGrid performed engineering calculations for a number of Pattern wind farms in Ontario.
Category:
NERC ComplianceYear:
2018SynchroGrid performed engineering calculations to verify that relay settings are in compliance with PRC-025-1 for Pattern Energy wind farms located in the US.
Category:
NERC ComplianceYear:
2018SynchroGrid performed engineering calculations for Sharyland Utilities to verify that the relay and limiter settings at the Alibates Substation were in compliance with NERC PRC-019-2.
Category:
NERC ComplianceYear:
2018SynchroGrid performed engineering calculations for Sharyland Utilities’ Tule Canyon Substation to verify that relay and limiter settings were in compliance with NERC PRC-019-2.
Category:
NERC ComplianceYear:
2017SynchroGrid created an innovative process that has simplified the verification of generator protective relays for NERC PRC-025 compliance.