Pattern Energy: Panhandle 2 Wind Arc Flash

Category:

System Protection

Year:

2020

SynchroGrid performed an arc flash analysis on the electrical distribution system for a wind farm operated by Pattern Energy.

CTT: SEL-487E Reactor Relays Replacement

Category:

System Protection

Year:

2019

SynchroGrid upgraded SEL 487E-0 Reactor relays with SEL-487E-3 relays.

Relay Setting Development for Local Substation

Category:

System Protection

Year:

2019

SynchroGrid provided relay setting development services for a local substation.

Pattern Energy: South Kent Wind Arc Flash

Category:

System Protection

Year:

2019

SynchroGrid performed an arc flash analysis on the electrical distribution system for South Kent Wind Farm - a wind farm operated by Pattern Energy.

Substation Feeder Addition

Category:

System Protection

Year:

2019

SynchroGrid provided relay setting and relay coordination services for a local  substation.

Relay Settings and Relay Coordination for Local Substation

Category:

System Protection

Year:

2019

SynchroGrid developed relay settings and provided relay coordination services for a local substation.

Relay Settings for Feeder and Bus Tie Protection

Category:

System Protection

Year:

2019

SynchroGrid provided relay settings for a local substation.

CTT: T60 Relay Replacement

Category:

System Protection

Year:

2019

SynchroGrid replaced GE-T60 reactor relays with SEL-387E relays and upgraded SEL 487E-0 reactor relays with SEL-487E-3 relays.

Relay Settings Development and Coordination Study

Category:

System Protection

Year:

2019

SynchroGrid provided relay setting and relay coordination services for a local substation. 

Load More