Pattern Energy: Panhandle 2 Wind Arc Flash

Category:

System Protection

Year:

2020

SynchroGrid performed an arc flash analysis on the electrical distribution system for a wind farm operated by Pattern Energy.

Rayburn Country Electric Cooperative: PRC-027-1 Wide Area Coordination (WAC)

Category:

NERC Compliance

Year:

2020

SynchroGrid performed a wide area coordination study to ensure compliance with PRC-027-1 Requirement 2.

CTT: PRC-027-1 Wide Area Coordination (WAC)

Category:

NERC Compliance

Year:

2019

SynchroGrid performed a wide area coordination for CTT’s 345kV system.

CTT: SEL-487E Reactor Relays Replacement

Category:

System Protection

Year:

2019

SynchroGrid upgraded SEL 487E-0 Reactor relays with SEL-487E-3 relays.

NRG: Cottonwood PRC-025

Category:

NERC Compliance

Year:

2019

SynchroGrid conducted a generator NERC-PRC-025-2 compliance review for NRG. 

Relay Setting Development for Local Substation

Category:

System Protection

Year:

2019

SynchroGrid provided relay setting development services for a local substation.

Pattern Energy: South Kent Wind Arc Flash

Category:

System Protection

Year:

2019

SynchroGrid performed an arc flash analysis on the electrical distribution system for South Kent Wind Farm - a wind farm operated by Pattern Energy.

Substation Feeder Addition

Category:

System Protection

Year:

2019

SynchroGrid provided relay setting and relay coordination services for a local  substation.

CTT: Replacement of Reactor Relays at Gray Substation

Category:

NERC Compliance

Year:

2019

SynchroGrid developed relay settings to replace reactor relays (GE-T60 and SEL-487E-0 were replaced with SEL-387E and SEL-487E-3) and updated drawings, control schematics, and GOOSE architect files to coordinate communications.

Load More